Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PROD -
Message number: 059
Message text: Production process model already locked by user &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PROD059
- Production process model already locked by user & ?The SAP error message
/SAPAPO/PROD059
indicates that a production process model is currently locked by another user. This typically occurs in the context of SAP Advanced Planning and Optimization (APO) when multiple users attempt to access or modify the same production process model simultaneously.Cause:
- Concurrent Access: Another user is currently editing or has locked the production process model.
- Session Timeout: A previous session may not have released the lock due to a timeout or an unexpected termination.
- System Error: Occasionally, system errors or inconsistencies can lead to locks not being released properly.
Solution:
Check Lock Status:
- Use transaction code
SM12
to check for locks in the system. You can filter by the user ID or the object type to find the specific lock.- If you find that the lock is held by a user who is no longer active, you may need to delete the lock entry.
Contact the User:
- If the lock is held by another user, communicate with them to see if they can release the lock or if they are done with their changes.
Wait and Retry:
- If the lock is temporary, waiting for the other user to finish their work may be the simplest solution.
Release the Lock:
- If you have the necessary authorizations, you can manually release the lock using transaction
SM12
. Be cautious with this approach, as it may lead to data inconsistencies if the other user is still working on the model.Check for System Issues:
- If locks are persisting without a clear reason, it may be worth checking for system issues or inconsistencies. In such cases, consulting with your SAP Basis team may be necessary.
Related Information:
If the issue persists or if you encounter frequent locking issues, it may be beneficial to review user training or system configurations to optimize the workflow and reduce conflicts.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PROD058
Material consumption is not maintained
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PROD057
Material flow only along a start/end relationship
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PROD060
Specify at least one resource as calendar resource
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PROD061
No plan found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.