Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PROD -
Message number: 058
Message text: Material consumption is not maintained
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PROD058
- Material consumption is not maintained ?The SAP error message
/SAPAPO/PROD058
indicates that material consumption is not maintained for a specific product in the Advanced Planning and Optimization (APO) module. This error typically arises when the system is trying to perform a planning operation (like production planning or demand planning) but cannot find the necessary consumption data for the material in question.Cause:
Missing Consumption Data: The material in question does not have any consumption data maintained in the system. This could be due to:
- The material not being set up correctly in the APO system.
- The consumption data not being transferred from the ERP system to APO.
- The material being newly created and not yet having consumption data.
Incorrect Configuration: The configuration settings for the material or the planning area may not be set up correctly, leading to the absence of consumption data.
Master Data Issues: There may be issues with the master data related to the material, such as missing or incorrect entries in the material master or planning book.
Solution:
Maintain Consumption Data:
- Go to the relevant transaction in SAP APO (like
/SAPAPO/MC62
for maintaining consumption data) and ensure that the consumption data for the material is correctly maintained.- If the material is new, ensure that it has been properly set up in the system.
Check Master Data:
- Verify the material master data in both the ERP and APO systems to ensure that all necessary fields are filled out correctly.
- Ensure that the material is included in the relevant planning book and that the planning area is correctly configured.
Data Transfer:
- If the consumption data is supposed to be transferred from the ERP system, check the data transfer settings and ensure that the data is being sent correctly.
- You may need to run the relevant data transfer jobs to ensure that the latest data is available in APO.
Configuration Review:
- Review the configuration settings for the planning area and ensure that they are set up to handle consumption data correctly.
- Check if the planning strategy for the material is appropriate and if it requires consumption data.
Consult Documentation:
- Refer to SAP documentation or help resources for specific details on how to maintain consumption data and troubleshoot related issues.
Related Information:
/SAPAPO/MC62
for maintaining consumption data, /SAPAPO/MC90
for planning book configuration, and /SAPAPO/MDP1
for master data maintenance.By following these steps, you should be able to resolve the /SAPAPO/PROD058
error and ensure that material consumption is properly maintained in your SAP APO system.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PROD057
Material flow only along a start/end relationship
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PROD056
Scrap in % must lie between 0 and 100
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PROD059
Production process model already locked by user &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PROD060
Specify at least one resource as calendar resource
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.