Message type: E = Error
Message class: /SAPAPO/PROD -
Message number: 047
Message text: Minimum distance between operation segments larger than maximum distance
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /SAPAPO/PROD047 indicates that there is a conflict in the production planning process, specifically related to the scheduling of operations in a production order. The error message states that the minimum distance between operation segments is larger than the maximum distance allowed. This typically occurs in the context of production planning and scheduling in SAP Advanced Planning and Optimization (APO).
Cause: Operation Segments: In production orders, operations are divided into segments. Each segment has a defined minimum and maximum distance (or time) that must be maintained between them.
Configuration Issues: The configuration of the operation segments may not be set correctly, leading to a situation where the minimum distance required exceeds the maximum distance allowed. Resource Constraints: The resources assigned to the operations may have constraints that prevent them from being scheduled within the defined limits. Routing Issues: The routing defined for the production order may not align with the operational capabilities
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PROD046
PPM &1: Activity net is not connected
What causes this issue? A production process model (PPM) &1 is exploded as preparation for order creation. The activities defined in the PPM are ...
/SAPAPO/PROD045
PPM &1: Activity net contains a cycle
What causes this issue? A production process model (PPM) with the short text &1 is exploded as preparation for order creation. The activities def...
/SAPAPO/PROD048
Operation description is overwritten
What causes this issue? A different operation text is maintained for this operation. If you save this operation, the operation text will be overwritt...
/SAPAPO/PROD049
Resource is not assigned to the mode
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.