Message type: E = Error
Message class:  /SAPAPO/PROD -  
Message number: 046
Message text: PPM &1: Activity net is not connected
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /SAPAPO/PROD046 PPM &1: Activity net is not connected typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with Production Planning and detailed scheduling. This error indicates that there is an issue with the production process model (PPM) where the activity net (the network of activities that are planned) is not properly connected or defined.
Cause: Missing Connections: The activity net may not have the necessary connections between activities, which means that the system cannot determine the sequence or dependencies of the activities. Incorrect Configuration: There may be configuration issues in the PPM that prevent the activities from being linked correctly. Data Inconsistencies: There could be inconsistencies in the data related to the PPM, such as missing or incorrect activity definitions. Changes in the PPM: If changes were made to the PPM (like adding or removing activities) without properly updating the connections, this error can occur.
Solution: Check
 Get instant SAP help. Sign up for our Free Essentials Plan.
Get instant SAP help. Sign up for our Free Essentials Plan. 
/SAPAPO/PROD045 PPM &1: Activity net contains a cycle
What causes this issue?  A production process model (PPM) with the short text &1 is exploded as preparation for order creation. The activities def...
/SAPAPO/PROD044 Activity does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PROD047 Minimum distance between operation segments larger than maximum distance
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PROD048 Operation description is overwritten
What causes this issue?  A different operation text is maintained for this operation. If you save this operation, the operation text will be overwritt...
Click on this link to search all SAP messages.