Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PPO_OPT -
Message number: 000
Message text: The minimum shift duration should be 2 hours.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPO_OPT000
- The minimum shift duration should be 2 hours. ?The SAP error message
/SAPAPO/PPO_OPT000 The minimum shift duration should be 2 hours
typically occurs in the context of Advanced Planning and Optimization (APO) when dealing with production planning and scheduling. This error indicates that the shift duration defined in the planning parameters is less than the minimum required duration of 2 hours.Cause:
- Shift Configuration: The shift duration defined in the planning settings or in the production resources is set to less than 2 hours.
- Planning Parameters: The planning parameters for the production process may not align with the minimum shift duration requirements.
- Resource Settings: The resources (machines, labor, etc.) may have been configured with a shift duration that does not meet the minimum requirement.
Solution:
Adjust Shift Duration:
- Go to the configuration settings for the relevant production resource or planning area.
- Check the shift duration settings and ensure that they are set to at least 2 hours.
- If necessary, modify the shift settings to comply with the minimum duration requirement.
Review Planning Parameters:
- Navigate to the planning parameters in the APO system.
- Ensure that all parameters related to shifts and production scheduling are correctly configured to meet the minimum shift duration.
Resource Master Data:
- Check the master data for the production resources involved in the planning process.
- Ensure that the shift definitions in the resource master data are compliant with the minimum shift duration.
Consult Documentation:
- Review SAP documentation or help resources for additional guidance on configuring shifts and production resources.
Testing:
- After making the necessary adjustments, run a test scenario to ensure that the error does not reoccur.
Related Information:
By following these steps, you should be able to resolve the error and ensure that your planning processes in SAP APO function correctly.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PPM_UPGRADE1019
All PPMs were excluded from conversion; see log
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PPM_UPGRADE1018
All PPMs converted into UTC time format during upgrade
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PPO_OPT001
The total subdaily bucket duration cannot exceed 24 hours.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PPO_OPT002
Material location not found.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.