Message type: E = Error
Message class: /SAPAPO/PPM_MAINTAIN -
Message number: 165
Message text: This resource cannot be used in this plan -> res. &1 &2 &3 &4
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPM_MAINTAIN165
- This resource cannot be used in this plan -> res. &1 &2 &3 &4 ?The SAP error message /SAPAPO/PPM_MAINTAIN165 indicates that a specific resource cannot be used in a planning scenario. The message typically includes placeholders for the resource details, which are represented as &1, &2, &3, and &4. This error is commonly encountered in the context of Advanced Planning and Optimization (APO) within SAP.
Cause: The error can arise due to several reasons, including: Resource Availability: The resource may not be available for the specific planning period or may be blocked for use. Resource Configuration: The resource might not be configured correctly in the system, such as missing parameters or incorrect settings. Planning Version: The resource may not be assigned to the planning version you are working with. Resource Type: The resource type may not be compatible with the planning scenario or the specific operation being executed. Capacity Constraints: There may be capacity constraints that prevent the resource from being utilized in the plan.
Solution: To resolve this error, you can take
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PPM_MAINTAIN164
Maintain the cost profile &1 which does not yet exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PPM_MAINTAIN163
Choose a cost profile or assign a new name
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PPM_MAINTAIN166
Assign a primary resource for mode &1
What causes this issue? In PP/DS or template PPMs, a primary resource must also be assigned for each mode. This means that activity types without res...
/SAPAPO/PPM_MAINTAIN167
No authorization for location &1 and this function
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.