How To Fix /SAPAPO/PPM_MAINTAIN165 - This resource cannot be used in this plan -> res. &1 &2 &3 &4


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/PPM_MAINTAIN -

  • Message number: 165

  • Message text: This resource cannot be used in this plan -> res. &1 &2 &3 &4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PPM_MAINTAIN165 - This resource cannot be used in this plan -> res. &1 &2 &3 &4 ?

    The SAP error message /SAPAPO/PPM_MAINTAIN165 indicates that a specific resource cannot be used in a planning scenario. The message typically includes placeholders for the resource details, which are represented as &1, &2, &3, and &4. This error is commonly encountered in the context of Advanced Planning and Optimization (APO) within SAP.

    Cause:

    The error can arise due to several reasons, including:

    1. Resource Availability: The resource may not be available for the specific planning period or may be blocked for use.
    2. Resource Configuration: The resource might not be configured correctly in the system, such as missing parameters or incorrect settings.
    3. Planning Version: The resource may not be assigned to the planning version you are working with.
    4. Resource Type: The resource type may not be compatible with the planning scenario or the specific operation being executed.
    5. Capacity Constraints: There may be capacity constraints that prevent the resource from being utilized in the plan.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Resource Availability:

      • Go to the resource master data and check if the resource is available for the required planning period.
      • Ensure that the resource is not blocked or in maintenance mode.
    2. Review Resource Configuration:

      • Verify the configuration of the resource in the system. Check for any missing parameters or incorrect settings that may prevent its use.
      • Ensure that the resource is correctly defined in the relevant planning area.
    3. Validate Planning Version:

      • Ensure that the resource is assigned to the planning version you are using. You can check this in the planning book or the resource master data.
    4. Check Resource Type Compatibility:

      • Confirm that the resource type is compatible with the operations you are trying to execute in the planning scenario.
    5. Analyze Capacity Constraints:

      • Review any capacity constraints that may be affecting the resource. This includes checking for any existing orders or planned orders that may be utilizing the resource.
    6. Consult Documentation:

      • Refer to SAP documentation or help resources for additional insights on the specific error message and its implications.

    Related Information:

    • Transaction Codes: You may use transaction codes like /SAPAPO/RES01 (Resource Overview) or /SAPAPO/PPM (Production Planning and Detailed Scheduling) to investigate resource settings and availability.
    • SAP Notes: Check for any relevant SAP Notes that may address known issues related to this error message.
    • Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    By following these steps, you should be able to identify the root cause of the error and implement the necessary solutions to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant