Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 237
Message text: Prod. &1 at loc. &2 is referenced by the 2 supersession chains &3 and &4
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER237
- Prod. &1 at loc. &2 is referenced by the 2 supersession chains &3 and &4 ?The SAP error message
/SAPAPO/PP_OPTIMIZER237
indicates that a product at a specific location is being referenced by two different supersession chains. This situation can arise in the context of Advanced Planning and Optimization (APO) when dealing with product lifecycle management, where products are replaced or superseded by new versions.Cause:
The error occurs when:
&1
) at a location (identified by &2
) is involved in two different supersession chains (identified by &3
and &4
).To resolve this error, you can take the following steps:
Review Supersession Chains:
Consolidate Supersession Chains:
Update Product Master Data:
Consult Documentation:
Testing:
Seek Support:
By following these steps, you should be able to resolve the error and ensure that your product planning processes run smoothly.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PP_OPTIMIZER236
Duration of PPM/PDS &1 is too long
What causes this issue? The production process model (PPM) or the production data structure (PDS) &V1& uses a resource &V2& for seque...
/SAPAPO/PP_OPTIMIZER235
Product decomposition with cross-period lot-size planning is used
What causes this issue? You are using the product decomposition in connection with cross-period lot size planning.System Response In terms of the cr...
/SAPAPO/PP_OPTIMIZER238
Product &1 at location &2 is referenced by the two FFF classes &3 and &4
What causes this issue? Two or more FFF classes are referring to a common product. This is not allowed in SNP Optimization. The products of the FFFcl...
/SAPAPO/PP_OPTIMIZER239
Minimum capacity defined for a non-production resource &1 in bucket &2
What causes this issue? You have defined a minimum capacity for resource &1 in bucket &2, although it is not a production resource.System Res...
Click on this link to search all SAP messages.