Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 236
Message text: Duration of PPM/PDS &1 is too long
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER236
- Duration of PPM/PDS &1 is too long ?The SAP error message /SAPAPO/PP_OPTIMIZER236 indicates that the duration of a Production Planning Model (PPM) or a Production Data Structure (PDS) is too long for the optimizer to handle effectively. This can occur in the context of Advanced Planning and Optimization (APO) when the planning horizon or the duration of the production process exceeds the limits set in the system.
Cause: Long Duration of PPM/PDS: The primary cause of this error is that the duration defined for the PPM or PDS exceeds the maximum allowable duration for the optimizer to process. Configuration Settings: The settings in the optimizer configuration may not be suitable for the duration of the production process. Data Issues: There may be incorrect or unrealistic data in the PPM or PDS that leads to an excessively long duration.
Solution: Review and Adjust PPM/PDS Duration: Check the duration settings in the PPM or PDS. If the duration is indeed too long, consider breaking it down
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PP_OPTIMIZER235
Product decomposition with cross-period lot-size planning is used
What causes this issue? You are using the product decomposition in connection with cross-period lot size planning.System Response In terms of the cr...
/SAPAPO/PP_OPTIMIZER234
Product &2 cannot be substituted by product &3
What causes this issue? Due to the substitution rules of interchangeability group &V1&, it is not possible to substitute product &V2&...
/SAPAPO/PP_OPTIMIZER237
Prod. &1 at loc. &2 is referenced by the 2 supersession chains &3 and &4
What causes this issue? Two or more supersession chains are referring to a common product. This is not allowed in SNP Optimization. The products of t...
/SAPAPO/PP_OPTIMIZER238
Product &1 at location &2 is referenced by the two FFF classes &3 and &4
What causes this issue? Two or more FFF classes are referring to a common product. This is not allowed in SNP Optimization. The products of the FFFcl...
Click on this link to search all SAP messages.