Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 230
Message text: PPM/PDS &1 uses two resources for sequence-dependent lot-size planning
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER230
- PPM/PDS &1 uses two resources for sequence-dependent lot-size planning ?The SAP error message /SAPAPO/PP_OPTIMIZER230 indicates that there is an issue with the planning data in the context of sequence-dependent lot-size planning. Specifically, it suggests that the Production Planning Model (PPM) or the Product Data Structure (PDS) is configured to use two different resources for the same operation, which is not allowed in the context of sequence-dependent lot-size planning.
Cause: Multiple Resources Defined: The PPM or PDS may have been set up with multiple resources for a single operation, which can lead to confusion in the planning process. Configuration Error: There may be a configuration error in the way resources are assigned to operations in the PPM or PDS. Inconsistent Data: The data in the PPM or PDS may be inconsistent, leading to the optimizer being unable to determine which resource to use for planning.
Solution: Review Resource Assignment: Check the PPM and PDS to ensure that each operation is assigned only one resource. If multiple resources
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PP_OPTIMIZER229
Setup matrix &1: Triangle inequality for setup costs not fulfiled.
What causes this issue? The setup matrix &V1& does not fulfill triangle inequality concerning the setup costs. For the three setup statuses ...
/SAPAPO/PP_OPTIMIZER228
No setup matrix assigned to resource &1
What causes this issue? No setup matrix is assigned to resource &v1&, although sequence-dependent lot size planning can be carried out for th...
/SAPAPO/PP_OPTIMIZER231
PPM/PDS &1 without setup key uses resources with setup matrixes
What causes this issue? The production process model (PPM) or the production data structure (PDS) &V1& does not have a setup key, but uses th...
/SAPAPO/PP_OPTIMIZER232
Setup key for PPM/PDS &1 is not maintained in setup matrix &4
What causes this issue? The production process model (PPM) or the production data structure (PDS) &V1& with the setup key &V2& uses a...
Click on this link to search all SAP messages.