Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 229
Message text: Setup matrix &1: Triangle inequality for setup costs not fulfiled.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER229
- Setup matrix &1: Triangle inequality for setup costs not fulfiled. ?The SAP error message /SAPAPO/PP_OPTIMIZER229 indicates that there is an issue with the setup costs defined in the setup matrix for the production planning and optimization (PP/DS) module. Specifically, it refers to the triangle inequality not being fulfilled for the setup costs.
Cause: The triangle inequality for setup costs is a mathematical condition that must be satisfied for the setup costs between different products or resources. It states that for three products A, B, and C, the setup cost from A to B plus the setup cost from B to C should be greater than or equal to the setup cost from A to C. If this condition is not met, it can lead to inconsistencies in the optimization calculations.
Solution: To resolve this error, you should: Review the Setup Matrix: Check the setup costs defined in the setup matrix for the relevant products or resources. Ensure that the costs are correctly defined and
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PP_OPTIMIZER228
No setup matrix assigned to resource &1
What causes this issue? No setup matrix is assigned to resource &v1&, although sequence-dependent lot size planning can be carried out for th...
/SAPAPO/PP_OPTIMIZER226
Setup matrix &1 is empty
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PP_OPTIMIZER230
PPM/PDS &1 uses two resources for sequence-dependent lot-size planning
What causes this issue? The production process model (PPM) or the production data structure (PDS) &V1& uses the two resources &V2& an...
/SAPAPO/PP_OPTIMIZER231
PPM/PDS &1 without setup key uses resources with setup matrixes
What causes this issue? The production process model (PPM) or the production data structure (PDS) &V1& does not have a setup key, but uses th...