How To Fix /SAPAPO/PP_OPTIMIZER146 - Production process model/PDS &1: Cannot be executed


/SAPAPO/PP_OPTIMIZER146 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PP_OPTIMIZER -

  • Message number: 146

  • Message text: Production process model/PDS &1: Cannot be executed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PP_OPTIMIZER146 - Production process model/PDS &1: Cannot be executed ?
    The SAP error message /SAPAPO/PP_OPTIMIZER146 indicates that there is an issue with the Production Process Model (PDS) for a specific product or resource in the Advanced Planning and Optimization (APO) module. The error message typically states that the PDS cannot be executed, which can be due to several reasons.
    Causes:
    
    
    Missing or Incomplete PDS: The PDS for the specified product may not be created or may be incomplete. This can happen if the necessary data has not been maintained in the system.
    
    
    Incorrect Configuration: The configuration of the PDS might be incorrect, such as missing operations, resources, or sequences that are required for the production process.
    
    
    Resource Availability: The resources required for the production process may not be available or may be incorrectly defined in the system.
    
    
    Planning Version Issues: The planning version being used may not be active or may not have the necessary data.
    
    
    Locking Issues: There may be locks on the PDS or

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant