Message text: Product &1: Costs for production exceed costs for not delivering
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER141
- Product &1: Costs for production exceed costs for not delivering ?The SAP error message
/SAPAPO/PP_OPTIMIZER141
indicates that the costs associated with producing a product exceed the costs of not delivering it. This typically arises in the context of production planning and optimization within SAP Advanced Planning and Optimization (APO). Here’s a breakdown of the cause, potential solutions, and related information:Cause:
- Cost Structure Issues: The cost of producing the product (including materials, labor, overhead, etc.) is higher than the cost of not fulfilling the order (e.g., lost sales, penalties).
- Production Constraints: There may be constraints in production capacity or resources that make it unfeasible to produce the item at a reasonable cost.
- Incorrect Master Data: The product master data, including cost estimates, may be incorrectly maintained, leading to inaccurate cost calculations.
- Demand and Supply Mismatch: The demand for the product may not justify the production costs, especially if there are alternative products or substitutes available.
- Planning Parameters: The planning parameters set in the system (like lot sizes, safety stock levels, etc.) may not be optimized for the current market conditions.
Solutions:
- Review Costing: Check the cost structure of the product in the material master. Ensure that all relevant costs are accurately reflected.
- Adjust Production Plans: If the production costs are indeed too high, consider adjusting the production plan. This could involve changing the production schedule, reducing batch sizes, or even discontinuing the product if it is not profitable.
- Optimize Master Data: Ensure that the product master data is up-to-date and accurately reflects the current market conditions and cost structures.
- Evaluate Demand: Analyze the demand for the product. If demand is low, it may not be worth producing the item. Consider focusing on more profitable products.
- Use Alternative Products: If there are alternative products that can be produced at a lower cost, consider shifting production to those items.
- Consult with Stakeholders: Engage with finance, sales, and production teams to understand the broader implications of production costs and delivery commitments.
Related Information:
/SAPAPO/OPTIMIZER
for running the optimizer.By addressing the underlying causes and implementing the suggested solutions, you can resolve the error and improve your production planning processes.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PP_OPTIMIZER140
Product &1: Shelf life not uniform
What causes this issue? Product &V1& at location &V2& is considered to have a shelf life (which means, it can be kept for a limited t...
/SAPAPO/PP_OPTIMIZER139
Product &1 at location &2: Inconsistent opportunity costs
What causes this issue? Demand for product &V1& at location &V2&, priority class &V3&, bucket &V4&: Costs for not del...
/SAPAPO/PP_OPTIMIZER142
Product &1:Costs for external procurement exceed costs for not delivering
What causes this issue? The costs for externally procuring product &V1& at location &V2& are higher than the costs &V3& for n...
/SAPAPO/PP_OPTIMIZER143
Product &1: Costs for storage exceed costs for not delivering
What causes this issue? The costs for storing product &V1& at location &V2& are higher than the costs &V3& for not delivering...