Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 117
Message text: Storage resource &1: Not available or has no available capacity
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER117
- Storage resource &1: Not available or has no available capacity ?The SAP error message
/SAPAPO/PP_OPTIMIZER117
indicates that a storage resource (like a warehouse or storage location) is either not available or does not have any available capacity to accommodate the planned activities. This error typically arises during the planning process in SAP Advanced Planning and Optimization (APO) when the optimizer cannot find sufficient storage capacity for the materials being processed.Causes:
- Storage Resource Not Defined: The storage resource may not be defined in the system or may not be assigned to the relevant planning area.
- Capacity Constraints: The storage resource may have reached its maximum capacity, meaning it cannot accommodate any additional stock.
- Resource Status: The storage resource may be marked as inactive or unavailable due to maintenance or other reasons.
- Planning Parameters: Incorrect planning parameters or settings may lead to the optimizer not recognizing available capacity.
- Time Period Issues: The time period for which the planning is being executed may not align with the availability of the storage resource.
Solutions:
Check Storage Resource Configuration:
- Verify that the storage resource is correctly defined in the system.
- Ensure that it is assigned to the appropriate planning area and is active.
Review Capacity Settings:
- Check the capacity settings for the storage resource to ensure that it has sufficient capacity to handle the planned stock.
- If necessary, increase the capacity or adjust the planning parameters to reflect realistic storage capabilities.
Resource Availability:
- Confirm that the storage resource is available for use during the planning period. If it is under maintenance or otherwise unavailable, consider using an alternative resource.
Adjust Planning Parameters:
- Review and adjust the planning parameters in the optimizer settings to ensure they align with the available resources and capacities.
Check Time Periods:
- Ensure that the planning time periods are correctly set and that the storage resource is available during those periods.
Run Capacity Check:
- Perform a capacity check to identify any potential bottlenecks or issues with resource allocation.
Related Information:
/SAPAPO/OPTIMIZER
to access the optimizer settings and configurations.By following these steps, you should be able to identify the root cause of the error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PP_OPTIMIZER116
Production process model/PDS &1: Minimum production lot not considered
What causes this issue? A minimum production lot size (&V3&) was set for production process model &V1& at location &V2&. This...
/SAPAPO/PP_OPTIMIZER115
Production process model/PDS &1: Discrete lot size not considered
What causes this issue? Production in discrete (integer-based) lot sizes was chosen for production process model &V1& at location &V2&...
/SAPAPO/PP_OPTIMIZER120
Transportable product &1: Discrete lot size not considered
What causes this issue? You set that you wanted to use discrete (integer-based) transportation lot sizes for transporting product &V1& over t...
/SAPAPO/PP_OPTIMIZER121
Transportation lane &1, product &2: Cost function not considered
What causes this issue? You specified a piecewise linear cost function to determine the costs for transporting product &V2& on transportation...
Click on this link to search all SAP messages.