Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 079
Message text: Location &1: Invalid limits for external procurement
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER079
- Location &1: Invalid limits for external procurement ?The SAP error message
/SAPAPO/PP_OPTIMIZER079 Location &1: Invalid limits for external procurement
typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, particularly when dealing with production planning and optimization scenarios. This error indicates that there are invalid limits set for external procurement at a specific location.Cause:
- Invalid Limits Configuration: The limits for external procurement (such as minimum and maximum order quantities, lead times, etc.) may not be correctly configured in the system.
- Data Inconsistencies: There may be inconsistencies in the master data related to the location, such as the procurement type or the settings for external procurement.
- Planning Parameters: The planning parameters for the location may not be set correctly, leading to conflicts in the optimization process.
- Resource Constraints: The system may be trying to optimize production or procurement but finds that the limits set for external procurement are not feasible given the current resource constraints.
Solution:
- Check Configuration: Review the configuration settings for the location in question. Ensure that the limits for external procurement are set correctly in the relevant master data (e.g., material master, location master).
- Review Master Data: Verify the master data for the location, including procurement types, lead times, and any other relevant parameters. Make sure they are consistent and correctly defined.
- Adjust Planning Parameters: If necessary, adjust the planning parameters for the location to ensure they align with the expected procurement limits.
- Run Consistency Checks: Use SAP tools to run consistency checks on the master data and planning parameters to identify any discrepancies.
- Consult Documentation: Refer to SAP documentation or notes related to the specific error message for additional guidance and troubleshooting steps.
- Contact SAP Support: If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.
Related Information:
/SAPAPO/OPTIMIZER
to access the optimizer settings or /SAPAPO/MAT1
to check material master data.By following these steps, you should be able to identify and resolve the issue related to the error message /SAPAPO/PP_OPTIMIZER079
.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PP_OPTIMIZER077
Production process model/PDS &1: Inconsistent resource usage
What causes this issue? Production process model &V1& uses resource &V2&, but the required quantities (fixed and variable) are always...
/SAPAPO/PP_OPTIMIZER075
Production process model/PDS &1: Cannot be executed
What causes this issue? Production process model &V1& cannot be executed because its duration &V2& exceeds the planning horizon lengt...
/SAPAPO/PP_OPTIMIZER081
Production process model/PDS &1: Invalid limits for production quantities
What causes this issue? Production process model &V1& in bucket &V2& has a minimum production quantity &V3& that is greater t...
/SAPAPO/PP_OPTIMIZER090
Product &2: Costs for delayed deliveries are missing
What causes this issue? Location &V1&, product &V2&, priority class &V3&, delivery delayed by &V4& buckets: No penalt...
Click on this link to search all SAP messages.