Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 077
Message text: Production process model/PDS &1: Inconsistent resource usage
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER077
- Production process model/PDS &1: Inconsistent resource usage ?The SAP error message
/SAPAPO/PP_OPTIMIZER077
indicates that there is an inconsistency in the resource usage defined in the Production Process Model (PDS) for a specific resource. This error typically arises during the planning process in SAP Advanced Planning and Optimization (APO) when the system detects that the resource usage defined for a particular operation does not match the expected or required usage.Causes:
- Inconsistent Resource Definitions: The resource usage defined in the PDS may not align with the actual capabilities or configurations of the resource.
- Incorrect PDS Configuration: There may be errors in the way the PDS is set up, such as missing or incorrect parameters for the resource.
- Resource Capacity Issues: The resource may have capacity constraints that are not properly reflected in the PDS.
- Changes in Resource Settings: If there have been recent changes to the resource settings or configurations, these may not have been updated in the PDS.
- Data Integrity Issues: There may be data integrity issues in the master data that affect how resources are defined and utilized.
Solutions:
- Review the PDS Configuration: Check the PDS for the specific product and ensure that the resource usage is correctly defined. Look for any discrepancies in the resource parameters.
- Validate Resource Settings: Ensure that the resource settings in the system (transaction codes like
/SAPAPO/RES01
for resource definitions) are consistent with the PDS.- Check Capacity Constraints: Review the capacity constraints of the resource to ensure they are correctly set up and that they match the requirements defined in the PDS.
- Update Master Data: If there have been changes to the resource or product master data, ensure that these changes are reflected in the PDS.
- Run Consistency Checks: Use SAP tools to run consistency checks on the PDS and resources to identify and rectify any inconsistencies.
- Consult Documentation: Refer to SAP documentation or notes related to the specific error message for additional guidance and troubleshooting steps.
Related Information:
/SAPAPO/RES01
(Resource Definition), /SAPAPO/PDS1
(PDS Maintenance), and /SAPAPO/OPTIMIZER
(Optimizer Settings).By following these steps, you should be able to identify and resolve the inconsistency in resource usage that is causing the error message /SAPAPO/PP_OPTIMIZER077
.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PP_OPTIMIZER075
Production process model/PDS &1: Cannot be executed
What causes this issue? Production process model &V1& cannot be executed because its duration &V2& exceeds the planning horizon lengt...
/SAPAPO/PP_OPTIMIZER073
Production process model/PDS &1: Cannot be executed
What causes this issue? Production process model &V1& cannot be executed from bucket &V2& to bucket &V3& because its maximum ...
/SAPAPO/PP_OPTIMIZER079
Location &1: Invalid limits for external procurement
What causes this issue? The minimum &V3& for external procurement is larger than the maximum &V4& for product &V2& at locatio...
/SAPAPO/PP_OPTIMIZER081
Production process model/PDS &1: Invalid limits for production quantities
What causes this issue? Production process model &V1& in bucket &V2& has a minimum production quantity &V3& that is greater t...
Click on this link to search all SAP messages.