Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PINV -
Message number: 088
Message text: Product &1, loc. &2 (VCL) - procurement lead time changed in BAdI
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PINV088
- Product &1, loc. &2 (VCL) - procurement lead time changed in BAdI ?The SAP error message
/SAPAPO/PINV088
indicates that there is an issue related to the procurement lead time for a specific product at a specific location in the Advanced Planning and Optimization (APO) module. This error typically arises when the procurement lead time for a product has been modified in a Business Add-In (BAdI) implementation, which can lead to inconsistencies or conflicts in the planning process.Cause:
- BAdI Implementation: The procurement lead time has been changed in a BAdI implementation, which may not align with the existing planning data or settings.
- Data Inconsistency: There may be inconsistencies between the master data and the settings defined in the BAdI.
- Planning Version: The error may also occur if the planning version being used does not reflect the latest changes made in the BAdI.
- Configuration Issues: There could be configuration issues in the APO system that are causing the lead time to be incorrectly calculated or applied.
Solution:
- Review BAdI Implementation: Check the implementation of the BAdI that is responsible for modifying the procurement lead time. Ensure that the logic is correct and that it is not inadvertently causing issues.
- Check Master Data: Verify the master data for the product and location in question. Ensure that the procurement lead time is set correctly and is consistent with the BAdI logic.
- Update Planning Version: If changes have been made, ensure that the planning version is updated and reflects the latest settings. You may need to re-run the planning run to apply the changes.
- Consistency Check: Perform a consistency check in the APO system to identify any discrepancies between the master data and the planning data.
- Consult Documentation: Review SAP documentation related to the specific BAdI and procurement lead time settings to ensure that all configurations are correctly set up.
- Debugging: If necessary, use debugging tools to trace the execution of the BAdI and identify where the lead time is being altered.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PINV087
Prod. &1, location &2 - procurement lead time changed in BAdI
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PINV086
Inconsistent sub-BOD: child is stocked while parent is not (&1, &2, &3)
What causes this issue? Your BOD contains at least one inconsistency. The inconsistency is that the current node in your BOD does not have a stocked ...
/SAPAPO/PINV089
Stocking decision was not made due to lack of demand in current period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PINV090
Round EOQ to largest pack size (&1, &2)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.