How To Fix /SAPAPO/PINV087 - Prod. &1, location &2 - procurement lead time changed in BAdI


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/PINV -

  • Message number: 087

  • Message text: Prod. &1, location &2 - procurement lead time changed in BAdI

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PINV087 - Prod. &1, location &2 - procurement lead time changed in BAdI ?

    The SAP error message /SAPAPO/PINV087 typically indicates that there is an issue related to the procurement lead time for a product at a specific location, which has been altered through a Business Add-In (BAdI). This error is often encountered in the context of Advanced Planning and Optimization (APO) within SAP systems.

    Cause:

    The error message is triggered when:

    1. The procurement lead time for a product at a specific location has been modified in a BAdI implementation.
    2. The system detects that the new lead time is inconsistent with the existing planning data or settings.
    3. There may be a mismatch between the expected lead time and the actual lead time defined in the system.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check BAdI Implementation: Review the BAdI implementation that is modifying the procurement lead time. Ensure that the logic implemented is correct and that it is not inadvertently changing the lead time to an invalid value.

    2. Validate Lead Time Settings: Go to the product master data and check the procurement lead time settings for the specified product and location. Ensure that the lead time is set correctly and is consistent with the planning parameters.

    3. Consistency Check: Perform a consistency check in the APO system to identify any discrepancies in the planning data. This can help you pinpoint where the inconsistency lies.

    4. Review Planning Books: If you are using planning books, check the relevant planning books and data views to ensure that the lead time is correctly reflected and that there are no conflicting entries.

    5. Debugging: If you have access to the development environment, you may want to debug the BAdI implementation to see how the lead time is being calculated and applied. This can help identify any logical errors in the code.

    6. Consult Documentation: Refer to SAP documentation or notes related to the specific BAdI you are using. There may be known issues or additional configuration steps required.

    7. SAP Support: If the issue persists and you cannot identify the cause, consider reaching out to SAP support for assistance. Provide them with the error message details and any relevant configuration information.

    Related Information:

    • BAdI (Business Add-In): A BAdI is a SAP enhancement technique that allows you to add your own business logic to standard SAP applications without modifying the original code.
    • Procurement Lead Time: This is the time required to procure materials from suppliers. It is a critical parameter in supply chain planning and can affect inventory levels and service levels.
    • APO (Advanced Planning and Optimization): A component of SAP that provides advanced planning capabilities for supply chain management.

    By following these steps, you should be able to identify and resolve the issue related to the procurement lead time change in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker