How To Fix /SAPAPO/PDRP_APPR189 - Planned order &1 has more than one schedule line


/SAPAPO/PDRP_APPR189 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PDRP_APPR -

  • Message number: 189

  • Message text: Planned order &1 has more than one schedule line

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PDRP_APPR189 - Planned order &1 has more than one schedule line ?
    The SAP error message /SAPAPO/PDRP_APPR189 Planned order &1 has more than one schedule line typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with the planned order that has multiple schedule lines associated with it. This can lead to confusion in the planning process, as the system expects a single schedule line for a planned order.
    
    Cause: Multiple Schedule Lines: The primary cause of this error is that the planned order in question has more than one schedule line. This can happen if the order was created with multiple delivery dates or quantities. Data Inconsistency: There may be inconsistencies in the master data or transaction data that lead to the creation of multiple schedule lines for a single planned order.
    Configuration Issues: Incorrect configuration in the APO system or in the integration with the ERP system can also lead to this error.
    Solution: Review Planned Order: Check the details

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker