Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PDRP_APPR -
Message number: 076
Message text: Scheduling agreement &1 is inconsistent and is not used
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PDRP_APPR076
- Scheduling agreement &1 is inconsistent and is not used ?The SAP error message
/SAPAPO/PDRP_APPR076
indicates that there is an inconsistency with a scheduling agreement in the Advanced Planning and Optimization (APO) module. This error typically arises when the system detects that the scheduling agreement is not properly configured or is missing necessary data, which prevents it from being used in planning processes.Cause
The inconsistency can be caused by several factors, including:
- Missing or Incomplete Data: The scheduling agreement may lack essential information, such as valid dates, quantities, or other relevant details.
- Status Issues: The scheduling agreement might be in a status that does not allow it to be used (e.g., it could be marked as inactive).
- Master Data Issues: Related master data (like material master, vendor master, etc.) may be incomplete or inconsistent.
- Configuration Issues: There may be configuration settings in the APO system that are not aligned with the scheduling agreement.
- Integration Issues: Problems with the integration between SAP ERP and SAP APO can lead to inconsistencies.
Solution
To resolve the error, you can take the following steps:
Check Scheduling Agreement: Review the scheduling agreement in the SAP system to ensure that all required fields are filled out correctly. Look for any missing or incorrect data.
Verify Status: Ensure that the scheduling agreement is active and has the correct status for it to be used in planning.
Review Master Data: Check the related master data (material, vendor, etc.) for completeness and correctness. Make sure that all necessary data is available and correctly configured.
Check Configuration: Review the configuration settings in the APO system to ensure they are set up correctly for the scheduling agreement to be utilized.
Integration Check: If applicable, verify that the integration between SAP ERP and SAP APO is functioning correctly. Look for any errors in the data transfer that might have caused the inconsistency.
Consult Documentation: Refer to SAP documentation or notes related to this specific error message for additional guidance and troubleshooting steps.
Contact SAP Support: If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.
Related Information
ME33L
(Display Scheduling Agreement) to view the details of the scheduling agreement./SAPAPO/SDP94
(Interactive Planning) to analyze the planning situation.By following these steps, you should be able to identify and resolve the inconsistency related to the scheduling agreement in your SAP APO system.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PDRP_APPR075
User has all planning rights
What causes this issue? The current user has all planning rights.System Response The user has all planning rights and can therefore access many loca...
/SAPAPO/PDRP_APPR074
Error when calculating planning horizon
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDRP_APPR077
More than one interchangeability group found for location &1 product &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDRP_APPR078
No entry for product &1 in found in interchangeability group &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.