How To Fix /SAPAPO/PDRP_APPR013 - & scheduling agreement items were discarded


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/PDRP_APPR -

  • Message number: 013

  • Message text: & scheduling agreement items were discarded

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PDRP_APPR013 - & scheduling agreement items were discarded ?

    The SAP error message /SAPAPO/PDRP_APPR013 typically indicates that there are issues related to the planning and scheduling of items in the Advanced Planning and Optimization (APO) module, particularly in the context of Demand Planning or Supply Network Planning. The message often states that certain scheduling agreement items were discarded due to various reasons.

    Causes:

    1. Inconsistent Data: The scheduling agreement may have inconsistent or incomplete data, such as missing delivery dates, quantities, or other critical fields.
    2. Planning Parameters: The planning parameters set for the scheduling agreement may not align with the requirements of the planning run.
    3. Product Master Data Issues: There may be issues with the product master data, such as incorrect settings for the planning strategy or other relevant fields.
    4. Capacity Constraints: If there are capacity constraints in the production or supply chain, the system may discard certain items that cannot be fulfilled.
    5. Time Periods: The scheduling agreement items may fall outside the planning horizon or time periods defined in the system.
    6. Discontinuation of Products: If the product associated with the scheduling agreement has been discontinued or is no longer valid, the items may be discarded.

    Solutions:

    1. Check Data Consistency: Review the scheduling agreement and ensure that all required fields are filled out correctly. Validate the data in the product master and ensure that it is consistent.
    2. Review Planning Parameters: Check the planning parameters for the scheduling agreement and ensure they are set correctly. Adjust them if necessary to align with the planning requirements.
    3. Validate Product Master Data: Ensure that the product master data is complete and accurate. Check the planning strategy, availability check settings, and other relevant fields.
    4. Analyze Capacity Constraints: Review the capacity planning and ensure that there are no constraints that would prevent the scheduling agreement items from being fulfilled. Adjust production schedules or capacity as needed.
    5. Adjust Planning Horizon: If the items are falling outside the planning horizon, consider extending the planning horizon or adjusting the scheduling agreement dates.
    6. Check for Discontinued Products: Verify if the product is still active and valid in the system. If it has been discontinued, consider removing or updating the scheduling agreement.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like /SAPAPO/SDP94 (for Demand Planning) or /SAPAPO/MC90 (for Supply Network Planning) to analyze the planning data and see the details of the discarded items.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message. SAP Notes can provide patches or additional guidance on resolving known issues.
    • Documentation: Refer to the SAP Help Portal for detailed documentation on APO and the specific planning functions you are using.

    If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in APO for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author