How To Fix /SAPAPO/PDRP636 - DRP Input: Sched. agmt intermediate status schedule line no. &1


/SAPAPO/PDRP636 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PDRP -

  • Message number: 636

  • Message text: DRP Input: Sched. agmt intermediate status schedule line no. &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PDRP636 - DRP Input: Sched. agmt intermediate status schedule line no. &1 ?
    The SAP error message /SAPAPO/PDRP636 typically relates to issues in the Demand Planning and Replenishment (DRP) process within SAP Advanced Planning and Optimization (APO). The specific message indicates that there is a problem with a scheduled agreement that has an intermediate status for a particular schedule line number.
    
    Cause: Intermediate Status: The error suggests that the schedule line in question is not in a final or valid state for processing. This could be due to various reasons, such as: The schedule line is still being processed or has not been fully confirmed. There may be inconsistencies in the data related to the scheduling agreement. The schedule line might be in a status that does not allow it to be used for planning or replenishment. Data Integrity Issues: There could be issues with the data integrity in the scheduling agreement, such as missing or incorrect information.
    Configuration Issues: There may be configuration settings in the APO system that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant