How To Fix /SAPAPO/PAGT_HEUR117 - Scheduling errors occured while finite scheduling


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/PAGT_HEUR -

  • Message number: 117

  • Message text: Scheduling errors occured while finite scheduling

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PAGT_HEUR117 - Scheduling errors occured while finite scheduling ?

    The SAP error message /SAPAPO/PAGT_HEUR117 indicates that there were scheduling errors during the finite scheduling process in SAP Advanced Planning and Optimization (APO). This error typically arises when the system encounters issues while trying to schedule production orders or planned orders based on the constraints defined in the system.

    Causes:

    1. Resource Constraints: The resources (machines, labor, etc.) may be fully booked or not available during the required time slots.
    2. Capacity Issues: The capacity of the resources may not be sufficient to handle the planned production.
    3. Order Conflicts: There may be conflicts between different orders that cannot be resolved due to overlapping requirements or constraints.
    4. Incorrect Master Data: Issues with master data such as incorrect resource definitions, production versions, or planning parameters can lead to scheduling errors.
    5. Time Constraints: The scheduling horizon may not be set correctly, or there may be time-related constraints that prevent scheduling.
    6. Missing or Incorrect Dependencies: Dependencies between orders or operations may not be defined correctly, leading to scheduling conflicts.

    Solutions:

    1. Check Resource Availability: Review the availability of resources and ensure that they are not overbooked. Adjust the production schedule if necessary.
    2. Review Capacity Settings: Ensure that the capacity settings for the resources are correctly defined and that they can accommodate the planned production.
    3. Analyze Order Conflicts: Use the APO order management tools to identify and resolve any conflicts between orders.
    4. Validate Master Data: Check the master data for accuracy, including resources, production versions, and planning parameters. Correct any discrepancies.
    5. Adjust Scheduling Parameters: Review and adjust the scheduling parameters in the APO system to ensure they align with the production requirements.
    6. Run the Heuristic Again: After making the necessary adjustments, rerun the finite scheduling heuristic to see if the errors are resolved.

    Related Information:

    • Transaction Codes: Use transaction codes like /SAPAPO/SDP94 (for planning board) or /SAPAPO/MC90 (for capacity planning) to analyze the scheduling situation.
    • Logs and Messages: Check the detailed logs and messages generated during the scheduling run for more specific information about the errors encountered.
    • SAP Notes: Look for relevant SAP Notes that may address known issues or provide additional guidance on resolving scheduling errors.
    • Consult Documentation: Refer to the SAP APO documentation for best practices on finite scheduling and resource management.

    If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP APO for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant