How To Fix /SAPAPO/PAGT_HEUR115 - PPM/PDS switch period reached; switch started in period [&1, &2]


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/PAGT_HEUR -

  • Message number: 115

  • Message text: PPM/PDS switch period reached; switch started in period [&1, &2]

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PAGT_HEUR115 - PPM/PDS switch period reached; switch started in period [&1, &2] ?

    The SAP error message /SAPAPO/PAGT_HEUR115 indicates that a switch period has been reached in the context of Production Planning and Detailed Scheduling (PP/DS) within SAP Advanced Planning and Optimization (APO). This message typically occurs when the planning horizon has been exceeded or when the system is trying to execute a heuristic that is no longer valid due to the current planning period.

    Cause:

    1. Planning Horizon Exceeded: The error usually arises when the planning process attempts to access or manipulate data beyond the defined planning horizon.
    2. Switch Period: The system has a defined switch period for the planning heuristics, and if the current period exceeds this, the heuristic cannot be executed.
    3. Configuration Issues: There may be configuration settings in the planning area or the planning book that are not aligned with the current planning requirements.

    Solution:

    1. Adjust Planning Horizon: Review and, if necessary, extend the planning horizon in the configuration settings of the planning area. This can be done in the SAP APO system under the relevant settings for the planning area.
    2. Check Heuristic Settings: Ensure that the heuristics being used are appropriate for the current planning period. You may need to adjust the settings or select a different heuristic that can handle the current planning requirements.
    3. Review Switch Period Settings: Check the settings related to the switch period in the configuration of the planning area. Make sure that they are set correctly to allow for the necessary planning activities.
    4. Run Planning in Smaller Batches: If the planning horizon is too large, consider running the planning process in smaller batches to avoid hitting the switch period limit.
    5. Consult Documentation: Refer to SAP documentation or help resources for specific details on the heuristics and planning area configurations.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like /SAPAPO/HEUR to access heuristic settings or /SAPAPO/DP for demand planning settings.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide updates and patches that could resolve the issue.
    • SAP Community: Engage with the SAP Community forums for insights from other users who may have encountered similar issues.

    By following these steps, you should be able to resolve the error and continue with your planning activities in SAP APO.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author