How To Fix /SAPAPO/PAGT_HEUR115 - PPM/PDS switch period reached; switch started in period [&1, &2]


/SAPAPO/PAGT_HEUR115 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PAGT_HEUR -

  • Message number: 115

  • Message text: PPM/PDS switch period reached; switch started in period [&1, &2]

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/PAGT_HEUR115 - Details

  • The SAP error message /SAPAPO/PAGT_HEUR115 indicates that a switch period has been reached in the context of Production Planning and Detailed Scheduling (PP/DS) within SAP Advanced Planning and Optimization (APO). This message typically occurs when the planning horizon has been exceeded or when the system is trying to execute a heuristic that is no longer valid due to the current planning period.
    
    Cause: Planning Horizon Exceeded: The error usually arises when the planning process attempts to access or manipulate data beyond the defined planning horizon. Switch Period: The system has a defined switch period for the planning heuristics, and if the current period exceeds this, the heuristic cannot be executed.
    Configuration Issues: There may be configuration settings in the planning area or the planning book that are not aligned with the current planning requirements.
    Solution: Adjust Planning Horizon: Review and, if necessary, extend the planning horizon in the configuration settings of the planning area. This can

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/PAGT_HEUR115 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant