How To Fix /SAPAPO/OPT_VSR_MSG301 - Orders cannot be scheduled in the planning horizon


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/OPT_VSR_MSG -

  • Message number: 301

  • Message text: Orders cannot be scheduled in the planning horizon

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/OPT_VSR_MSG301 - Orders cannot be scheduled in the planning horizon ?

    The SAP error message /SAPAPO/OPT_VSR_MSG301 indicates that orders cannot be scheduled within the planning horizon. This typically occurs in the context of Advanced Planning and Optimization (APO) when the system is unable to find a feasible schedule for the orders due to constraints or settings in the planning environment.

    Causes:

    1. Planning Horizon Settings: The planning horizon may not be set correctly. If the orders fall outside the defined planning horizon, they cannot be scheduled.
    2. Capacity Constraints: There may be insufficient capacity in the production resources (e.g., machines, labor) to accommodate the orders.
    3. Order Dates: The start or finish dates of the orders may be outside the planning horizon.
    4. Resource Availability: Resources required for the orders may not be available during the requested time frame.
    5. Configuration Issues: There may be issues with the configuration of the planning area, such as incorrect settings for the planning strategy or resource allocation.
    6. Master Data Issues: Problems with master data, such as incorrect lead times, production versions, or resource definitions, can also lead to this error.

    Solutions:

    1. Check Planning Horizon: Review and adjust the planning horizon settings in the APO system. Ensure that the orders fall within this horizon.

      • Navigate to the relevant configuration settings in the APO system and adjust the planning horizon as needed.
    2. Review Capacity: Analyze the capacity of the resources involved in the scheduling. Ensure that there is enough capacity to handle the orders.

      • Use transaction codes like /SAPAPO/CC01 to check capacity and make adjustments if necessary.
    3. Adjust Order Dates: Verify the start and finish dates of the orders. If they are outside the planning horizon, consider adjusting them.

      • You can modify the order dates in the order management screen.
    4. Resource Availability Check: Ensure that the resources required for the orders are available during the scheduling period.

      • Check the availability of resources in the resource planning view.
    5. Configuration Review: Review the configuration of the planning area and ensure that all settings are correct.

      • Consult with your SAP APO configuration team to verify that the planning strategies and resource allocations are set up correctly.
    6. Master Data Validation: Validate the master data related to the orders, including production versions, lead times, and resource definitions.

      • Use transaction codes like /SAPAPO/MD01 to check and correct any discrepancies in master data.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes in SAP APO, such as /SAPAPO/CC01 for capacity checks and /SAPAPO/MD01 for master data checks.
    • Documentation: Refer to SAP documentation and notes related to scheduling and planning horizon issues for more detailed troubleshooting steps.
    • SAP Community: Engage with the SAP Community forums for insights and solutions shared by other users who may have encountered similar issues.

    By following these steps, you should be able to identify the root cause of the error and implement the necessary solutions to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author