How To Fix /SAPAPO/OO_VSVM010 - Capacity of step &1 is greater than/equal to the capacity of step &2


/SAPAPO/OO_VSVM010 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/OO_VSVM -

  • Message number: 010

  • Message text: Capacity of step &1 is greater than/equal to the capacity of step &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/OO_VSVM010 - Details

  • The SAP error message /SAPAPO/OO_VSVM010 indicates that there is a capacity issue in the context of production planning or scheduling within the SAP Advanced Planning and Optimization (APO) module. Specifically, it means that the capacity of a particular step in a production process (step &1) is greater than or equal to the capacity of another step (step &2). This can lead to scheduling conflicts or inefficiencies in the production process.
    
    Cause: Capacity Configuration: The capacity of the production steps may not be configured correctly. For example, if step &1 has a higher capacity than step &2, it can lead to bottlenecks. Production Process Design: The design of the production process may be flawed, where one step is not able to handle the output from the previous step effectively. Resource Allocation: There may be an issue with how resources are allocated to different steps, leading to an imbalance in capacity. Data Entry Errors: Incorrect data entries

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/OO_VSVM010 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker