How To Fix /SAPAPO/OO_VSVM010 - Capacity of step &1 is greater than/equal to the capacity of step &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/OO_VSVM -

  • Message number: 010

  • Message text: Capacity of step &1 is greater than/equal to the capacity of step &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/OO_VSVM010 - Capacity of step &1 is greater than/equal to the capacity of step &2 ?

    The SAP error message /SAPAPO/OO_VSVM010 indicates that there is a capacity issue in the context of production planning or scheduling within the SAP Advanced Planning and Optimization (APO) module. Specifically, it means that the capacity of a particular step in a production process (step &1) is greater than or equal to the capacity of another step (step &2). This can lead to scheduling conflicts or inefficiencies in the production process.

    Cause:

    1. Capacity Configuration: The capacity of the production steps may not be configured correctly. For example, if step &1 has a higher capacity than step &2, it can lead to bottlenecks.
    2. Production Process Design: The design of the production process may be flawed, where one step is not able to handle the output from the previous step effectively.
    3. Resource Allocation: There may be an issue with how resources are allocated to different steps, leading to an imbalance in capacity.
    4. Data Entry Errors: Incorrect data entries in the master data (like resource capacities, production rates, etc.) can also lead to this error.

    Solution:

    1. Review Capacity Settings: Check the capacity settings for both steps in the production process. Ensure that the capacities are set correctly and reflect the actual capabilities of the resources.
    2. Adjust Production Process: If the production process design is causing the issue, consider redesigning it to ensure that the capacities of the steps are aligned.
    3. Resource Reallocation: If possible, reallocate resources to balance the capacities of the steps. This may involve increasing the capacity of step &2 or decreasing the capacity of step &1.
    4. Data Validation: Validate the master data entries related to the production steps. Ensure that all relevant data is accurate and up-to-date.
    5. Consult Documentation: Refer to SAP documentation or guidelines for capacity planning and production scheduling to ensure compliance with best practices.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like /SAPAPO/CC01 (to check capacity) or /SAPAPO/SCM1 (to analyze the supply chain) to investigate further.
    • Capacity Planning: Familiarize yourself with capacity planning concepts in SAP APO, including how to set up and manage capacities for different resources.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance on capacity issues.
    • Support: If the issue persists, consider reaching out to SAP support or consulting with an SAP expert who specializes in APO.

    By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the error and improve the efficiency of your production planning processes.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker