How To Fix /SAPAPO/OO_VSVM009 - Capacity of step &1 is smaller than/equal to the capacity of step &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/OO_VSVM -

  • Message number: 009

  • Message text: Capacity of step &1 is smaller than/equal to the capacity of step &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/OO_VSVM009 - Capacity of step &1 is smaller than/equal to the capacity of step &2 ?

    The SAP error message /SAPAPO/OO_VSVM009 indicates that there is a capacity issue in the production planning process within the SAP Advanced Planning and Optimization (APO) module. Specifically, it means that the capacity of a particular step in a production process (step &1) is smaller than or equal to the capacity of another step (step &2). This can lead to issues in scheduling and resource allocation.

    Cause:

    1. Capacity Configuration: The capacity of the production step may have been incorrectly configured in the system. This could be due to manual entry errors or incorrect settings in the master data.
    2. Production Process Design: The design of the production process may not be optimal, leading to steps that cannot handle the required workload.
    3. Resource Constraints: There may be physical or operational constraints that limit the capacity of the production step.
    4. Data Inconsistencies: There may be inconsistencies in the data related to the production steps, such as incorrect routing or master data settings.

    Solution:

    1. Review Capacity Settings: Check the capacity settings for both steps involved in the error message. Ensure that the capacities are set correctly according to the production requirements.
    2. Adjust Production Process: If the production process design is flawed, consider redesigning it to ensure that the capacities of the steps are aligned appropriately.
    3. Re-evaluate Resource Allocation: Assess whether the resources allocated to each step are sufficient and make adjustments as necessary.
    4. Check Master Data: Verify the master data for the production steps, including routing, work centers, and production versions, to ensure that they are correctly defined.
    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on capacity planning and optimization in APO.
    6. Testing: After making adjustments, run tests to ensure that the changes resolve the issue and that the production process can proceed without further capacity conflicts.

    Related Information:

    • Transaction Codes: You may need to use transaction codes such as /SAPAPO/CC01 (to check capacity) or /SAPAPO/SCM1 (to analyze the supply chain) to investigate further.
    • SAP Notes: Check for any relevant SAP Notes that may address known issues or provide additional guidance on capacity management in APO.
    • Training and Documentation: Consider training for users involved in production planning to ensure they understand how to manage capacities effectively.

    By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the error and improve the efficiency of your production planning processes in SAP APO.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker