Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/OO_TR -
Message number: 216
Message text: Indicator for the requirements split must have the value ' ' or 'X'
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OO_TR216
- Indicator for the requirements split must have the value ' ' or 'X' ?The SAP error message
/SAPAPO/OO_TR216
indicates that there is an issue with the indicator for the requirements split in the Advanced Planning and Optimization (APO) module. Specifically, the error states that the indicator must have a value of either a blank (' ') or 'X'. This error typically arises during the planning process when the system expects a specific format or value for the requirements split indicator.Cause:
- Incorrect Value: The requirements split indicator is set to a value that is neither blank nor 'X'. This could be due to incorrect data entry or a configuration issue.
- Data Integrity Issues: There may be inconsistencies in the master data or transaction data that lead to this error.
- Custom Development: If there are custom enhancements or developments in the system, they might be affecting the expected values for this indicator.
Solution:
- Check the Indicator Value: Review the relevant planning book or transaction where the error occurred. Ensure that the requirements split indicator is set to either blank (' ') or 'X'.
- Data Validation: Validate the master data and transaction data to ensure that all required fields are populated correctly and that there are no invalid entries.
- Configuration Review: If the issue persists, review the configuration settings in the APO system related to the requirements split. Ensure that the settings align with the expected values.
- Debugging: If you have access to the development environment, you may want to debug the process to identify where the incorrect value is being set.
- Consult Documentation: Refer to SAP documentation or notes related to this error message for any specific guidance or patches that may address the issue.
- Contact SAP Support: If the problem cannot be resolved internally, consider reaching out to SAP support for assistance.
Related Information:
/SAPAPO/SDP94
for planning books or /SAPAPO/MC90
for configuration settings.By following these steps, you should be able to identify and resolve the issue related to the /SAPAPO/OO_TR216
error message.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/OO_TR215
The validity of product &1 is incorrect
What causes this issue? The start date that you have specified for the first validity of the quota arrangement header &V1& does not lie in th...
/SAPAPO/OO_TR214
Source of supply &1 is not assigned to the model
What causes this issue? You have not assigned the source of supply &V1& (PPM, iPPE) to the model.System Response The system issues an error ...
/SAPAPO/OO_TR217
The location of TSP / carrier &1 is not assigned to the model
What causes this issue? The location of the transportation service provider &V1& is not assigned to the model.System Response The system iss...
/SAPAPO/OO_TR218
Cost function &1 is not assigned to procurement category external procmnt
What causes this issue? The cost function &V1& does not belong to procurement type <DS:GLOS.3526BFF4AFAB52B9E10000009B38F974>external p...
Click on this link to search all SAP messages.