Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/OM_SYNC -
Message number: 045
Message text: Matrix from liveCache test: Is deleted during the correction
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OM_SYNC045
- Matrix from liveCache test: Is deleted during the correction ?The SAP error message
/SAPAPO/OM_SYNC045
typically indicates an issue related to the synchronization of data between the SAP Advanced Planning and Optimization (APO) system and the liveCache. The specific message "Matrix from liveCache test: Is deleted during the correction" suggests that there was an attempt to correct or modify a matrix in the liveCache, but the operation resulted in the deletion of that matrix.Cause:
- Data Integrity Issues: The matrix may have been in an inconsistent state, leading to its deletion during the correction process.
- Configuration Errors: Incorrect configuration settings in the APO or liveCache could lead to unexpected behavior during synchronization.
- Version Mismatch: There may be a mismatch between the versions of the APO and liveCache, causing synchronization issues.
- Corrupted Data: The data in the liveCache might be corrupted or not properly aligned with the APO data.
Solution:
- Check LiveCache Status: Ensure that the liveCache is running correctly and is not in a locked or inconsistent state. You can use transaction codes like
/SAPAPO/LC10
to check the status.- Rebuild the Matrix: If the matrix is essential for your operations, you may need to recreate it. This can often be done through the APO interface.
- Data Consistency Check: Run consistency checks on the data in both APO and liveCache to identify and resolve any discrepancies.
- Review Configuration: Check the configuration settings in both APO and liveCache to ensure they are set up correctly.
- Update Software: Ensure that both the APO and liveCache are updated to the latest versions to avoid compatibility issues.
- Consult SAP Notes: Look for relevant SAP Notes that may address this specific error message or provide guidance on similar issues.
Related Information:
/SAPAPO/LC10
for liveCache monitoring and /SAPAPO/OM01
for matrix management.If the problem persists after trying the above solutions, it may be necessary to contact SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/OM_SYNC044
Confirmation only exists in LC
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/OM_SYNC043
There is a confirmation in LC for an inactive sales scheduling agreement
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/OM_SYNC046
RPMCALL ended with fatal error
What causes this issue? RPMCALL ended with a fatal error.System Response The planning matrices still have the status from before the RPMCALL started...
/SAPAPO/OM_SYNC047
RPMCALL terminated
What causes this issue? RPMCALL terminated and the cause is unknown.System Response The planning matrices still have the status from before the RPMC...
Click on this link to search all SAP messages.