Message type: E = Error
Message class: /SAPAPO/OM_ERROR2 -
Message number: 344
Message text: Extern. constraints must not be adhered to more strictly than inter. ones
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OM_ERROR2344
- Extern. constraints must not be adhered to more strictly than inter. ones ?The SAP error message /SAPAPO/OM_ERROR2344 indicates that there is a conflict between external constraints and internal constraints in the Advanced Planning and Optimization (APO) module. Specifically, it suggests that the external constraints (which may come from suppliers, customers, or other external sources) are being adhered to more strictly than the internal constraints (which are defined within the system for production, inventory, etc.). This can lead to infeasibility in the planning process.
Cause: Constraint Configuration: The external constraints are set up in such a way that they are more restrictive than the internal constraints. This can happen if the external demand or supply conditions are not aligned with the internal planning parameters. Data Inconsistency: There may be inconsistencies in the data being used for planning, such as incorrect lead times, lot sizes, or capacity constraints. Planning Version Issues: The planning version being used may not be correctly configured to handle the constraints appropriately. Master Data Issues:
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/OM_ERROR2343
Scheduled constraint where scheduling-relev. activity is a dummy activity
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR2342
Line contraint whose predecessor does not sit on line resource
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR2345
Dynamic pegging must not be adhered to more strictly than fixed pegging
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR2346
Can only use insert, close gaps, or force mode if respecting int. constr.
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
Click on this link to search all SAP messages.