How To Fix /SAPAPO/OM_ERROR2343 - Scheduled constraint where scheduling-relev. activity is a dummy activity


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/OM_ERROR2 -

  • Message number: 343

  • Message text: Scheduled constraint where scheduling-relev. activity is a dummy activity

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/OM_ERROR2343 - Scheduled constraint where scheduling-relev. activity is a dummy activity ?
    The SAP error message /SAPAPO/OM_ERROR2343 indicates that there is a scheduling issue related to a dummy activity in the context of Advanced Planning and Optimization (APO) in SAP. This error typically arises when the system encounters a scheduled constraint where the scheduling-relevant activity is identified as a dummy activity, which cannot be processed as expected.
    
    Cause: Dummy Activity: The error is primarily caused by the presence of a dummy activity in the scheduling process. Dummy activities are placeholders that do not have any actual processing time or resource allocation associated with them. Scheduling Constraints: The scheduling constraints defined in the planning scenario may not be compatible with the dummy activity, leading to conflicts during the scheduling process. Incorrect Configuration: There may be incorrect configuration settings in the planning area or the master data that lead to the system treating a legitimate activity as a dummy.
    Solution: Review Activity Configuration: Check the configuration of the activities in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker