How To Fix /SAPAPO/OM_ERROR2098 - A setup activity is not at the start of a cover constraint chain


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/OM_ERROR2 -

  • Message number: 098

  • Message text: A setup activity is not at the start of a cover constraint chain

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/OM_ERROR2098 - A setup activity is not at the start of a cover constraint chain ?
    The SAP error message /SAPAPO/OM_ERROR2098 indicates that there is an issue with the setup activities in the context of a cover constraint chain in SAP Advanced Planning and Optimization (APO). This error typically arises when the system expects a setup activity to be at the beginning of a chain of operations, but it is not positioned correctly.
    
    Cause: Incorrect Setup Activity Positioning: The setup activity is not defined as the first activity in the cover constraint chain. In a production scenario, setup activities should precede the actual production activities to ensure that the necessary preparations are completed before production starts.
    Configuration Issues: There may be issues with how the setup activities and constraints are configured in the APO system. Data Integrity Issues: There could be inconsistencies or errors in the master data related to the production process, such as the routing or the production version.
    Solution: Check the Setup Activity Position: Review the configuration of the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant