How To Fix /SAPAPO/OM_ERROR2096 - Activity cannot be dispatched at the times specified


/SAPAPO/OM_ERROR2096 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/OM_ERROR2 -

  • Message number: 096

  • Message text: Activity cannot be dispatched at the times specified

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/OM_ERROR2096 - Activity cannot be dispatched at the times specified ?
    The SAP error message /SAPAPO/OM_ERROR2096 indicates that an activity cannot be dispatched at the specified times. This error typically occurs in the context of Advanced Planning and Optimization (APO) when there are issues related to scheduling or resource availability.
    Causes:
    
    Resource Availability: The resource required for the activity may not be available during the specified time frame. This could be due to maintenance, capacity constraints, or other scheduling conflicts.
    Time Constraints: The activity may have time constraints that prevent it from being scheduled at the requested times. This could include start and end times that are not compatible with the resource's availability.
    Capacity Issues: The capacity of the resource may be exceeded, meaning that there are not enough resources to handle the planned activities.
    Incorrect Planning Parameters: The planning parameters or settings in the system may not be configured correctly, leading to scheduling conflicts.
    Dependencies: There may be dependencies between activities that are not being met,

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker