Message type: E = Error
Message class: /SAPAPO/OM_ERROR -
Message number: 182
Message text: Several scheduler parameter structures with the same priority
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OM_ERROR182
- Several scheduler parameter structures with the same priority ?The SAP error message /SAPAPO/OM_ERROR182 indicates that there are multiple scheduler parameter structures defined with the same priority in the Advanced Planning and Optimization (APO) module. This can lead to ambiguity in scheduling decisions, as the system does not know which parameter structure to prioritize.
Cause: Duplicate Priority Levels: The error typically arises when multiple scheduling parameter structures are assigned the same priority level. This can happen due to configuration errors or oversight during the setup of scheduling parameters. Configuration Changes: If changes were made to the scheduling parameters without proper checks, it could lead to overlapping priorities. Custom Developments: If there are custom developments or enhancements in the APO system, they might inadvertently create conflicts in scheduling parameters.
Solution: Review Scheduling Parameters: Go to the transaction code /SAPAPO/OM01 (or the relevant transaction for managing scheduling parameters). Check the list of defined scheduling parameter structures and their assigned priorities. Identify any structures that share the same priority. Adjust Priorities: Modify the
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/OM_ERROR179
Invalid max_tolerance for pegging area
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR178
Invalid min_tolerance for pegging area
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR183
This activity is not part of an order to be scheduled
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR184
Follow-up error
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.