Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/MC01 -
Message number: 820
Message text: No inconsistencies found in the plans or PPM in selection
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/MC01820
- No inconsistencies found in the plans or PPM in selection ?The SAP error message
/SAPAPO/MC01820
indicates that there are no inconsistencies found in the plans or Production Planning and Detailed Scheduling (PPDS) PPM (Production Process Model) in the selection you are trying to analyze. This message typically arises in the context of SAP Advanced Planning and Optimization (APO) when you are running checks or validations on your planning data.Cause:
- No Data to Validate: The selection criteria you provided may not match any existing plans or PPMs, leading to the system not finding any inconsistencies.
- Correct Data: The plans or PPMs you are checking may already be consistent, meaning there are no issues to report.
- Selection Criteria: The selection criteria used in the transaction may be too narrow or incorrectly defined, resulting in no data being processed.
Solution:
- Review Selection Criteria: Check the selection criteria you are using to ensure they are correct and broad enough to include relevant plans or PPMs.
- Check Data Existence: Verify that the plans or PPMs you expect to analyze actually exist in the system and are active.
- Run Consistency Checks: If you are looking for inconsistencies, you may want to run a different consistency check or validation process that is more appropriate for your data.
- Consult Documentation: Refer to SAP documentation or help resources for further guidance on the specific transaction or process you are using.
Related Information:
/SAPAPO/PPDS
for detailed scheduling.If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/MC01817
Plan &1 does not set value assignments/requirements for product
What causes this issue? In the product master, a class is assigned to product &V2& in plan &V1& , so that pegging takes place for the...
/SAPAPO/MC01816
CDP planning of product &1: See following message(s)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/MC01821
No inconsistencies found for the block planned resources in selection
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/MC01822
No inconsistencies found for the products in selection
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.