How To Fix /SAPAPO/MC01816 - CDP planning of product &1: See following message(s)


/SAPAPO/MC01816 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/MC01 -

  • Message number: 816

  • Message text: CDP planning of product &1: See following message(s)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/MC01816 - CDP planning of product &1: See following message(s) ?
    The SAP error message /SAPAPO/MC01816 typically relates to issues encountered during the Capacity-Dependent Planning (CDP) of a product in SAP Advanced Planning and Optimization (APO). This error indicates that there are problems with the planning of the specified product, and it often comes with additional messages that provide more context about the specific issue.
    Causes:
    
    Missing Master Data: The product may not have the necessary master data set up, such as product location, resources, or production versions.
    Capacity Constraints: There may be insufficient capacity available for the resources required to produce the product.
    Planning Parameters: Incorrect or missing planning parameters for the product or resource can lead to this error.
    Data Inconsistencies: There may be inconsistencies in the data, such as incorrect time periods or planning versions.
    Resource Availability: The resources required for production may not be available during the planned time frame.
    
    Solutions:
    
    Check Master Data: Ensure that all necessary master data for the product is correctly

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker