Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/DMRES -
Message number: 232
Message text: Resource & is only used as a primary or calendar resource
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/DMRES232
- Resource & is only used as a primary or calendar resource ?The SAP error message
/SAPAPO/DMRES232
indicates that a resource is being used in a way that is not compatible with its defined type. Specifically, this error occurs when a resource is defined as a primary or calendar resource, but an attempt is made to use it in a context that requires a different type of resource.Cause:
- Resource Type Misconfiguration: The resource in question is configured as a primary or calendar resource in the system, but the operation being performed (such as planning or scheduling) requires a different type of resource (e.g., a secondary resource).
- Incorrect Assignment: The resource may be incorrectly assigned to a production process or planning scenario that does not support primary or calendar resources.
- Planning Object Misalignment: The planning object (like a production order or a planned order) may be expecting a different type of resource.
Solution:
Check Resource Configuration:
- Go to the resource master data in SAP APO and verify the configuration of the resource. Ensure that it is set up correctly for the intended use.
- If the resource needs to be used in a different context, consider changing its type to a secondary resource if applicable.
Review Planning Scenario:
- Check the planning scenario or the specific operation that is trying to use the resource. Ensure that it is compatible with the resource type.
- If necessary, adjust the planning scenario to accommodate the resource type.
Reassign Resources:
- If the resource is not suitable for the operation, consider reassigning a different resource that matches the requirements of the planning object.
Consult Documentation:
- Review SAP documentation or help resources for more details on resource types and their appropriate uses within the system.
Testing:
- After making changes, test the planning or scheduling operation again to ensure that the error is resolved.
Related Information:
By following these steps, you should be able to resolve the error and ensure that your resources are configured and used correctly within SAP APO.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/DMRES231
Resource & is not used in the PPM as a primary or calendar resource
What causes this issue? The resource is used in at least one PPM as a <LS>secondary resource</> or you have not set the indicator <LS&...
/SAPAPO/DMRES230
Resource & is not used aa primary or a calendar resource in the PDS
What causes this issue? The resource is used in at least one production data structure as a <LS>secondary resource</> or you have not set...
/SAPAPO/DMRES233
Resource &1 is locked by user &2, data could not be transferred
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DMRES234
& resources not available
What causes this issue? & resources are not available.System Response & resources are not available.How to fix this error? You will find th...
Click on this link to search all SAP messages.