Message type: E = Error
Message class: /SAPAPO/DMRES -
Message number: 221
Message text: Shift lasts longer than 24 hours
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/DMRES221
- Shift lasts longer than 24 hours ?The SAP error message
/SAPAPO/DMRES221
indicates that a shift in the planning or scheduling process lasts longer than 24 hours. This error typically arises in the context of Advanced Planning and Optimization (APO) when defining shifts for production resources or planning processes.Cause:
- Shift Definition: The shift you have defined in the system exceeds the maximum allowable duration of 24 hours. This can happen if the start and end times of the shift are incorrectly set.
- Resource Configuration: The configuration of the production resources or work centers may have shifts that are not aligned with the expected duration.
- Planning Parameters: The planning parameters or settings in the APO system may not be correctly configured to handle shifts longer than 24 hours.
Solution:
Review Shift Definitions:
- Go to the shift definition in the system and check the start and end times. Ensure that the total duration does not exceed 24 hours.
- Adjust the shift timings to ensure they fit within the 24-hour limit.
Check Resource Configuration:
- Navigate to the resource or work center configuration in APO and verify the shift settings.
- Make necessary adjustments to ensure that shifts are defined correctly.
Adjust Planning Parameters:
- Review the planning parameters related to shifts and resources in the APO system.
- Ensure that the settings are appropriate for your planning needs and do not allow for shifts longer than 24 hours.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidelines on defining shifts and managing resources in APO.
Testing:
- After making adjustments, test the changes by running the planning process again to ensure that the error does not reoccur.
Related Information:
By following these steps, you should be able to resolve the /SAPAPO/DMRES221
error and ensure that your shift definitions are compliant with the system's requirements.
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/DMRES220
Resource &1 has not been changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DMRES219
Place the cursor on a valid entry
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DMRES222
Resource &1 planning version &2 has not been changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DMRES223
Resource &1, planning version &2 used in PDS - action not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.