How To Fix /SAPAPO/DM_SCHEDFAIL061 - The activity was deallocated


/SAPAPO/DM_SCHEDFAIL061 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/DM_SCHEDFAIL -

  • Message number: 061

  • Message text: The activity was deallocated

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/DM_SCHEDFAIL061 - The activity was deallocated ?
    The SAP error message /SAPAPO/DM_SCHEDFAIL061 indicates that an activity in the Demand Management (DM) module of SAP Advanced Planning and Optimization (APO) has been deallocated. This typically occurs during the scheduling process when the system cannot allocate resources or fulfill the demand for a specific activity.
    
    Cause: Resource Availability: The resources required for the activity may not be available, leading to deallocation. Capacity Constraints: The activity may exceed the available capacity of the resources, causing the system to deallocate it. Scheduling Conflicts: Conflicts in scheduling, such as overlapping activities or time constraints, can lead to deallocation. Incorrect Master Data: Issues with master data, such as incorrect resource settings or planning parameters, can also cause this error. Planning Version Issues: If the planning version is not set correctly or if there are inconsistencies in the planning version, it may lead to deallocation.
    Solution: Check Resource Availability: Ensure that the required resources are available and not overbooked. You can do

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker