Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/DM_SCHEDFAIL -
Message number: 061
Message text: The activity was deallocated
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/DM_SCHEDFAIL061
- The activity was deallocated ?The SAP error message
/SAPAPO/DM_SCHEDFAIL061
indicates that an activity in the Demand Management (DM) module of SAP Advanced Planning and Optimization (APO) has been deallocated. This typically occurs during the scheduling process when the system cannot allocate resources or fulfill the demand for a specific activity.Cause:
- Resource Availability: The resources required for the activity may not be available, leading to deallocation.
- Capacity Constraints: The activity may exceed the available capacity of the resources, causing the system to deallocate it.
- Scheduling Conflicts: Conflicts in scheduling, such as overlapping activities or time constraints, can lead to deallocation.
- Incorrect Master Data: Issues with master data, such as incorrect resource settings or planning parameters, can also cause this error.
- Planning Version Issues: If the planning version is not set correctly or if there are inconsistencies in the planning version, it may lead to deallocation.
Solution:
- Check Resource Availability: Ensure that the required resources are available and not overbooked. You can do this by reviewing the resource allocation in the planning board.
- Review Capacity Settings: Check the capacity settings for the resources involved. Make sure that the capacity is sufficient to handle the demand.
- Adjust Scheduling Parameters: Review the scheduling parameters and ensure that there are no conflicts. Adjust the scheduling settings if necessary.
- Validate Master Data: Ensure that all relevant master data (e.g., resources, production versions, etc.) is correctly maintained and up to date.
- Check Planning Version: Verify that the correct planning version is being used and that it is consistent with the data being processed.
- Re-run the Planning Run: After making the necessary adjustments, re-run the planning run to see if the issue persists.
Related Information:
/SAPAPO/DM
for Demand Management or /SAPAPO/SC
for Supply Chain planning to analyze the situation further.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/DM_SCHEDFAIL060
The system has switched to infinite planning
What causes this issue? INCLUDE DETAIL_TERMINPROTOKOLL OBJECT DOKU ID TXSystem Response The system issues an error message and will not allow you to...
/SAPAPO/DM_SCHEDFAIL044
No gap for activity &1 found within the planning horizon
What causes this issue? INCLUDE DETAIL_TERMINPROTOKOLL OBJECT DOKU ID TXSystem Response The system issues an error message and will not allow you to...
/SAPAPO/DM_SCHEDFAIL062
Dynamic pegging has been violated - minimum pegging relationship
What causes this issue? INCLUDE DETAIL_TERMINPROTOKOLL OBJECT DOKU ID TXSystem Response The system issues an error message and will not allow you to...
/SAPAPO/DM_SCHEDFAIL063
Dynamic pegging has been violated - maximum pegging relationship
What causes this issue? INCLUDE DETAIL_TERMINPROTOKOLL OBJECT DOKU ID TXSystem Response The system issues an error message and will not allow you to...
Click on this link to search all SAP messages.