How To Fix /SAPAPO/DM_SCHEDFAIL044 - No gap for activity &1 found within the planning horizon


/SAPAPO/DM_SCHEDFAIL044 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/DM_SCHEDFAIL -

  • Message number: 044

  • Message text: No gap for activity &1 found within the planning horizon

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/DM_SCHEDFAIL044 - No gap for activity &1 found within the planning horizon ?
    The SAP error message /SAPAPO/DM_SCHEDFAIL044 No gap for activity &1 found within the planning horizon typically occurs in the context of Advanced Planning and Optimization (APO) when the system is unable to find a suitable time gap within the defined planning horizon to schedule a specific activity. This can happen for various reasons, including constraints in the production schedule, resource availability, or the defined planning horizon itself.
    Causes:
    
    Insufficient Planning Horizon: The planning horizon may be too short to accommodate the activity.
    Resource Constraints: The resources required for the activity may be fully booked or unavailable during the desired time frame.
    Activity Duration: The duration of the activity may exceed the available gaps in the schedule.
    Conflicting Activities: Other scheduled activities may be conflicting with the desired time for the activity.
    Incorrect Configuration: There may be issues with the configuration of the planning parameters or master data.
    
    Solutions:
    
    Extend the Planning Horizon: Review and, if necessary, extend the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant