Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/DM_SCHEDFAIL -
Message number: 024
Message text: Date of an activity lies outside the maximum planning time period
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/DM_SCHEDFAIL024
- Date of an activity lies outside the maximum planning time period ?The SAP error message
/SAPAPO/DM_SCHEDFAIL024
indicates that the date of an activity lies outside the maximum planning time period defined in the system. This error typically occurs in the context of Advanced Planning and Optimization (APO) when scheduling activities or operations that are not within the allowed planning horizon.Cause:
- Planning Horizon Configuration: The maximum planning time period is defined in the system settings. If the activity's scheduled date exceeds this period, the error will be triggered.
- Incorrect Date Settings: The dates for activities or operations may have been set incorrectly, leading to scheduling outside the defined planning horizon.
- Master Data Issues: There may be issues with the master data configuration, such as incorrect lead times or planning parameters that affect the scheduling of activities.
Solution:
Check Planning Horizon Settings:
- Navigate to the configuration settings in SAP APO and check the maximum planning horizon defined for your planning area.
- You can adjust the planning horizon if necessary to accommodate the scheduling of activities.
Review Activity Dates:
- Verify the dates assigned to the activities or operations that are causing the error. Ensure they fall within the defined planning horizon.
- If the dates are incorrect, update them to be within the valid range.
Adjust Master Data:
- Review the relevant master data (e.g., product master, location master, etc.) to ensure that all parameters related to lead times and scheduling are correctly configured.
- Make any necessary adjustments to ensure that the scheduling can occur within the defined planning horizon.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on adjusting planning horizons and understanding the implications of changes.
Testing:
- After making changes, perform a test run to ensure that the error no longer occurs and that activities can be scheduled successfully.
Related Information:
/SAPAPO/SDP94
(for planning book) or /SAPAPO/MC90
(for planning area settings) to access relevant configuration settings.By following these steps, you should be able to resolve the error and successfully schedule activities within the defined planning horizon.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/DM_SCHEDFAIL023
Specified time was not met
What causes this issue? INCLUDE DETAIL_TERMINPROTOKOLL OBJECT DOKU ID TXSystem Response The system issues an error message and will not allow you to...
/SAPAPO/DM_SCHEDFAIL022
Order structure contains a cycle
What causes this issue? INCLUDE DETAIL_TERMINPROTOKOLL OBJECT DOKU ID TXSystem Response The system issues an error message and will not allow you to...
/SAPAPO/DM_SCHEDFAIL025
Validity period cannot be adhered to
What causes this issue? INCLUDE DETAIL_TERMINPROTOKOLL OBJECT DOKU ID TXSystem Response The system issues an error message and will not allow you to...
/SAPAPO/DM_SCHEDFAIL026
Mode linkage of a relationship to the activity &1 cannot be adhered to
What causes this issue? INCLUDE DETAIL_TERMINPROTOKOLL OBJECT DOKU ID TXSystem Response The system issues an error message and will not allow you to...
Click on this link to search all SAP messages.