Message type: E = Error
Message class: /SAPAPO/DM_SCHEDFAIL -
Message number: 023
Message text: Specified time was not met
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/DM_SCHEDFAIL023
- Specified time was not met ?The SAP error message /SAPAPO/DM_SCHEDFAIL023 with the description "Specified time was not met" typically occurs in the context of SAP Advanced Planning and Optimization (APO) when a scheduling operation fails to meet the specified time constraints. This can happen during various processes, such as production planning, demand planning, or transportation planning. Causes: Resource Constraints: The resources (machines, labor, etc.) may not be available at the required time due to scheduling conflicts or maintenance activities. Capacity Issues: The planned capacity may not be sufficient to meet the demand within the specified time frame. Incorrect Time Settings: The time settings in the planning parameters may not align with the actual production or transportation times. Data Inconsistencies: There may be inconsistencies in master data, such as lead times, production times, or transportation durations. Planning Version Issues: The planning version being used may not be correctly set up or may have outdated data. Solutions: Check Resource Availability: Review the availability of resources
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/DM_SCHEDFAIL022
Order structure contains a cycle
What causes this issue? INCLUDE DETAIL_TERMINPROTOKOLL OBJECT DOKU ID TXSystem Response The system issues an error message and will not allow you to...
/SAPAPO/DM_SCHEDFAIL021
Activity &1 is outside the planning period
What causes this issue? INCLUDE DETAIL_TERMINPROTOKOLL OBJECT DOKU ID TXSystem Response The system issues an error message and will not allow you to...
/SAPAPO/DM_SCHEDFAIL024
Date of an activity lies outside the maximum planning time period
What causes this issue? INCLUDE DETAIL_TERMINPROTOKOLL OBJECT DOKU ID TXSystem Response The system issues an error message and will not allow you to...
/SAPAPO/DM_SCHEDFAIL025
Validity period cannot be adhered to
What causes this issue? INCLUDE DETAIL_TERMINPROTOKOLL OBJECT DOKU ID TXSystem Response The system issues an error message and will not allow you to...
Click on this link to search all SAP messages.