How To Fix /SAPAPO/DM_SCHEDFAIL009 - Dynamic pegging could not be adhered to


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/DM_SCHEDFAIL -

  • Message number: 009

  • Message text: Dynamic pegging could not be adhered to

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/DM_SCHEDFAIL009 - Dynamic pegging could not be adhered to ?

    The SAP error message /SAPAPO/DM_SCHEDFAIL009 indicates that dynamic pegging could not be adhered to during the scheduling process in SAP Advanced Planning and Optimization (APO). This error typically arises in the context of production planning and scheduling when the system is unable to allocate resources or materials according to the defined pegging relationships.

    Cause:

    1. Insufficient Resources: There may not be enough resources (e.g., machines, labor) available to meet the demand while adhering to the pegging relationships.
    2. Material Shortages: The required materials for production may not be available in the necessary quantities, leading to a failure in adhering to the pegging.
    3. Incorrect Configuration: The configuration of the pegging relationships or the planning parameters may be incorrect or not aligned with the production process.
    4. Planning Version Issues: The planning version being used may not have the correct data or settings, leading to conflicts in scheduling.
    5. Capacity Constraints: There may be capacity constraints that prevent the system from scheduling the production while adhering to the pegging.

    Solution:

    1. Check Resource Availability: Ensure that all necessary resources are available and that their capacities are correctly defined in the system.
    2. Review Material Availability: Check the availability of materials and ensure that the required quantities are on hand or can be procured in time.
    3. Validate Pegging Configuration: Review the configuration of dynamic pegging in the system to ensure it is set up correctly. This includes checking the pegging relationships and ensuring they align with the production process.
    4. Adjust Planning Parameters: If necessary, adjust the planning parameters or settings to allow for more flexibility in scheduling.
    5. Use Alternative Planning Versions: If the current planning version is causing issues, consider using a different version or creating a new one with the correct settings.
    6. Analyze Capacity Constraints: Review the capacity constraints in the system and adjust them if needed to allow for better scheduling.

    Related Information:

    • Dynamic Pegging: This is a method used in SAP APO to link demand and supply dynamically, ensuring that the right materials are allocated to the right production orders.
    • APO Planning Books: Review the planning books and key figures related to the production process to identify any discrepancies or issues.
    • SAP Notes: Check for any relevant SAP Notes or updates that may address known issues related to this error message.
    • Transaction Codes: Use transaction codes like /SAPAPO/SDP94 (for demand planning) or /SAPAPO/MC90 (for capacity planning) to analyze the planning data and identify issues.

    By following these steps, you should be able to diagnose and resolve the issue related to the error message /SAPAPO/DM_SCHEDFAIL009.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant