How To Fix /SAPAPO/DM_SCHEDFAIL008 - Fixed pegging relationship could not be adhered to


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/DM_SCHEDFAIL -

  • Message number: 008

  • Message text: Fixed pegging relationship could not be adhered to

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/DM_SCHEDFAIL008 - Fixed pegging relationship could not be adhered to ?

    The SAP error message /SAPAPO/DM_SCHEDFAIL008 indicates that a fixed pegging relationship could not be adhered to during the scheduling process in SAP Advanced Planning and Optimization (APO). This typically occurs in the context of production planning and scheduling when there are constraints related to the pegging of demand to supply.

    Cause:

    1. Fixed Pegging Relationships: The error arises when there is a fixed pegging relationship defined between a demand (like a sales order) and a supply (like a production order or stock). If the system cannot fulfill this relationship due to scheduling constraints, it triggers this error.
    2. Capacity Constraints: There may be insufficient capacity in the production resources to meet the demand pegged to a specific supply.
    3. Material Availability: The required materials for production may not be available, preventing the system from adhering to the pegging relationship.
    4. Scheduling Conflicts: Conflicts in scheduling, such as overlapping production orders or maintenance activities, can also lead to this error.
    5. Configuration Issues: Incorrect configuration of the pegging relationships or the planning parameters in APO can lead to this issue.

    Solution:

    1. Check Pegging Relationships: Review the pegging relationships in the system to ensure they are correctly defined and that the demand can be met by the available supply.
    2. Analyze Capacity: Check the capacity of the production resources to ensure they can handle the demand. If necessary, adjust the production schedule or increase capacity.
    3. Material Availability Check: Ensure that all required materials are available for the production orders. If materials are missing, procure them or adjust the production schedule accordingly.
    4. Review Scheduling: Look for any scheduling conflicts that may be preventing the adherence to the pegging relationship. Adjust the production orders or reschedule them as needed.
    5. Configuration Review: Verify the configuration settings related to pegging and scheduling in APO. Ensure that they align with the business requirements and processes.
    6. Use of Heuristics: If applicable, consider using heuristics or optimization techniques to resolve scheduling conflicts and adhere to pegging relationships.

    Related Information:

    • Transaction Codes: Use transaction codes like /SAPAPO/DM for demand management and /SAPAPO/SC for supply chain planning to analyze and manage the planning data.
    • SAP Notes: Check for relevant SAP Notes that may address specific issues related to this error message.
    • Documentation: Refer to SAP documentation on Advanced Planning and Optimization for detailed information on pegging, scheduling, and capacity planning.
    • Support: If the issue persists, consider reaching out to SAP support for assistance, providing them with detailed information about the error and the context in which it occurs.

    By following these steps, you should be able to identify the root cause of the error and implement the necessary solutions to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker