How To Fix /SAPAPO/DM_SCHEDFAIL005 - Validity of activity &1 lies outside planning period


/SAPAPO/DM_SCHEDFAIL005 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/DM_SCHEDFAIL -

  • Message number: 005

  • Message text: Validity of activity &1 lies outside planning period

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/DM_SCHEDFAIL005 - Validity of activity &1 lies outside planning period ?
    The SAP error message /SAPAPO/DM_SCHEDFAIL005 indicates that the validity of a specific activity (denoted as &1) lies outside the defined planning period in the SAP Advanced Planning and Optimization (APO) module. This error typically arises during the scheduling or planning processes when the system attempts to schedule an activity that is not valid within the current planning horizon.
    
    Cause: Planning Period Configuration: The planning period may not be set correctly, or the activity's validity period extends beyond the defined planning horizon. Activity Validity Dates: The activity may have specific start and end dates that do not align with the planning period. Master Data Issues: There may be inconsistencies or errors in the master data related to the activity, such as incorrect validity dates or missing information. Planning Version: The planning version being used may not include the activity or may have different settings that affect its validity.
    Solution: Check Planning Period Settings: Navigate to the planning area settings

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker