How To Fix /SAPAPO/DM_SCHEDFAIL001 - Scheduling/rescheduling successful - BOM invalid


/SAPAPO/DM_SCHEDFAIL001 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/DM_SCHEDFAIL -

  • Message number: 001

  • Message text: Scheduling/rescheduling successful - BOM invalid

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/DM_SCHEDFAIL001 - Scheduling/rescheduling successful - BOM invalid ?
    The SAP error message /SAPAPO/DM_SCHEDFAIL001 indicates that there was an issue with the scheduling or rescheduling process in the Advanced Planning and Optimization (APO) module, specifically related to the Bill of Materials (BOM) being invalid. This error typically arises during the planning process when the system attempts to schedule production or procurement activities but encounters an issue with the BOM configuration.
    
    Cause: Invalid BOM: The BOM may be incomplete, missing components, or incorrectly configured. This can happen if the BOM has not been maintained properly in the system. BOM Status: The BOM might be in a status that does not allow it to be used for scheduling (e.g., inactive or deleted). Material Master Issues: The material master data associated with the BOM may be incorrect or incomplete. Versioning Issues: If there are multiple versions of the BOM, the system may be referencing an outdated or incorrect version. Plant-Specific BOM: The BOM may not be valid for

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant