How To Fix /SAPAPO/DEPL_MESS620 - Roll-Up Schedule Date &1 earlier than Planning Start Date &2


/SAPAPO/DEPL_MESS620 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/DEPL_MESS -

  • Message number: 620

  • Message text: Roll-Up Schedule Date &1 earlier than Planning Start Date &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/DEPL_MESS620 - Roll-Up Schedule Date &1 earlier than Planning Start Date &2 ?
    The SAP error message /SAPAPO/DEPL_MESS620 indicates that there is a conflict between the roll-up schedule date and the planning start date in the Advanced Planning and Optimization (APO) module. Specifically, the roll-up schedule date is earlier than the planning start date, which is not allowed.
    
    Cause: This error typically occurs due to one of the following reasons: Incorrect Date Configuration: The roll-up schedule date has been set incorrectly in the planning book or in the deployment settings. Planning Parameters: The planning start date may have been set to a later date than the roll-up schedule date, leading to this inconsistency. Data Entry Error: Manual entry of dates may have led to an incorrect configuration.
    Solution: To resolve this error, you can take the following steps: Check Dates: Review the roll-up schedule date and the planning start date in the relevant planning book or deployment settings. Ensure that the roll-up schedule date is not set earlier than the planning start date. Adjust

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker