Message type: E = Error
Message class: /SAPAPO/DEPL_MESS -
Message number: 618
Message text: Plan start date - start date offset: &1 (start lead time check horizon)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/DEPL_MESS618
- Plan start date - start date offset: &1 (start lead time check horizon) ?The SAP error message /SAPAPO/DEPL_MESS618 typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with the planning start date in relation to the lead time check horizon. This error indicates that the plan start date is outside the acceptable range defined by the lead time settings.
Cause: The error message is triggered when the planned start date for a production or deployment order is set too far in the future or too close to the current date, violating the lead time check horizon. This can happen due to: Incorrect Planning Parameters: The lead time settings in the system may not be configured correctly, leading to a mismatch between the planned start date and the allowed planning horizon. Data Entry Errors: Users may inadvertently enter a start date that is not feasible based on the current configuration and lead times. Changes in Demand or Supply: Fluctuations in demand or
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/DEPL_MESS617
No Fixed Start Date of Planning Horizon
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS616
Trigger &3 set for product &1, parent location &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS619
Leadtime Check : Unexpected Error for product &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS620
Roll-Up Schedule Date &1 earlier than Planning Start Date &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.