Message type: E = Error
Message class: /SAPAPO/DEPL_MESS -
Message number: 311
Message text: Successor prod. planning date for prod. &1 was calculated for &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/DEPL_MESS311
- Successor prod. planning date for prod. &1 was calculated for &2 ?The SAP error message
/SAPAPO/DEPL_MESS311
typically relates to the Advanced Planning and Optimization (APO) module in SAP, specifically in the context of production planning and scheduling. This message indicates that the successor production planning date for a specific product was calculated based on certain parameters, but it may also imply that there is an issue or a need for further attention regarding the planning dates.Cause:
- Planning Parameters: The planning parameters for the product may not be set correctly, leading to unexpected planning dates.
- Dependencies: There may be dependencies or constraints in the production process that affect the planning dates.
- Master Data Issues: Inaccurate or incomplete master data (like lead times, production versions, etc.) can lead to incorrect calculations of planning dates.
- Resource Availability: If resources (machines, labor, etc.) are not available as planned, it can affect the successor planning dates.
- Configuration Issues: Incorrect configuration in the APO system can lead to miscalculations in planning.
Solution:
- Review Planning Parameters: Check the planning parameters for the product in question. Ensure that they are set correctly and align with the production process.
- Check Dependencies: Analyze any dependencies or constraints that may affect the production planning. This includes checking for any preceding operations that need to be completed before the successor can start.
- Validate Master Data: Ensure that all relevant master data is accurate and complete. This includes checking lead times, production versions, and any other relevant data.
- Resource Availability: Verify the availability of resources required for production. If there are constraints, consider adjusting the production schedule or resource allocation.
- Configuration Review: If the issue persists, review the configuration settings in the APO system to ensure they are set up correctly for your production planning needs.
- Consult Documentation: Refer to SAP documentation or help resources for specific details related to the error message and its implications.
Related Information:
/SAPAPO/DP
for demand planning or /SAPAPO/SC
for supply chain planning to analyze the planning data.By following these steps, you should be able to identify the cause of the error message and implement a solution to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/DEPL_MESS310
The stock exhaustion warning date for product &1 was calculated for &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS309
The maximum supplier procurement lead time for product &1 is &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS312
Supersession chain &1 was saved
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS313
No stock exhaustion horizon specified in the service profile
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...