Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/DEPL_MESS -
Message number: 309
Message text: The maximum supplier procurement lead time for product &1 is &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/DEPL_MESS309
- The maximum supplier procurement lead time for product &1 is &2 ?The SAP error message
/SAPAPO/DEPL_MESS309
indicates that the maximum supplier procurement lead time for a specific product has been exceeded. This error typically arises in the context of Advanced Planning and Optimization (APO) when the system is trying to plan procurement for a product, but the lead time defined in the system is longer than what is allowed or expected.Cause:
- Exceeding Maximum Lead Time: The lead time for procurement of the product exceeds the maximum limit set in the system.
- Configuration Issues: The maximum lead time might not be configured correctly in the system settings.
- Data Inconsistencies: There may be inconsistencies in the master data for the product or supplier, such as incorrect lead time values.
- Planning Parameters: The planning parameters for the product may not align with the actual procurement capabilities.
Solution:
- Check Product Master Data: Review the product master data in the system to ensure that the procurement lead time is set correctly. This includes checking the supplier lead time settings.
- Adjust Maximum Lead Time: If the lead time is indeed valid and necessary, consider adjusting the maximum supplier procurement lead time in the configuration settings of the APO system.
- Review Supplier Data: Ensure that the supplier data is accurate and that the lead times defined for suppliers are realistic and achievable.
- Planning Parameters: Review and adjust the planning parameters for the product to ensure they are aligned with the actual procurement process.
- Consult Documentation: Refer to SAP documentation or help resources for specific configuration steps related to lead time settings.
Related Information:
/SAPAPO/MC90
(for master data) or /SAPAPO/DP90
(for planning) to access relevant data.By addressing the underlying causes and ensuring that the configuration aligns with the actual procurement processes, you should be able to resolve the error message and continue with your planning activities.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/DEPL_MESS308
The maximum BoD procurement lead time for product &1 is &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS307
The stock exhaustion date for product &1 was calculated for the &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS310
The stock exhaustion warning date for product &1 was calculated for &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS311
Successor prod. planning date for prod. &1 was calculated for &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.