How To Fix /SAPAPO/DEPL_MESS130 - Capacity consumed at sending location &1 on &2 (final &3, initial &4)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/DEPL_MESS -

  • Message number: 130

  • Message text: Capacity consumed at sending location &1 on &2 (final &3, initial &4)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/DEPL_MESS130 - Capacity consumed at sending location &1 on &2 (final &3, initial &4) ?

    The SAP error message /SAPAPO/DEPL_MESS130 indicates that there is an issue related to capacity consumption at a sending location in the Advanced Planning and Optimization (APO) module of SAP. This message typically arises during the deployment process when the system detects that the capacity consumed at a specific location exceeds the available capacity.

    Cause:

    The error message can be triggered by several factors, including:

    1. Capacity Overload: The total capacity consumed at the sending location exceeds the available capacity defined in the system.
    2. Incorrect Planning Data: There may be discrepancies in the planning data, such as incorrect capacity settings, production orders, or planned orders.
    3. Resource Constraints: The resources (e.g., machines, labor) may not be adequately defined or may have been changed, leading to a mismatch in expected versus actual capacity.
    4. Time Period Issues: The time periods defined for capacity planning may not align with the deployment process, leading to incorrect calculations.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Capacity Settings: Review the capacity settings for the sending location. Ensure that the available capacity is correctly defined and that it matches the expected production or deployment requirements.

    2. Analyze Planning Data: Investigate the planning data for any discrepancies. Check for any planned orders, production orders, or other activities that may be consuming capacity unexpectedly.

    3. Adjust Resource Allocation: If necessary, adjust the allocation of resources to ensure that the capacity is sufficient to meet the demand. This may involve increasing the available capacity or redistributing workloads.

    4. Review Time Periods: Ensure that the time periods used in the deployment process align with the capacity planning periods. Adjust the planning horizon if needed.

    5. Run Capacity Evaluation: Use the capacity evaluation tools in SAP APO to analyze the capacity utilization and identify any bottlenecks or issues.

    6. Consult Documentation: Refer to SAP documentation or support notes related to capacity planning and deployment for additional guidance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as /SAPAPO/CC01 (Capacity Check) and /SAPAPO/DP (Demand Planning) to analyze capacity and demand.
    • SAP Notes: Check for any SAP Notes that may address known issues or provide patches related to capacity planning and deployment.
    • APO Configuration: Ensure that the APO system is correctly configured for capacity planning, including settings for resources, production versions, and planning strategies.

    By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it. If the issue persists, consider reaching out to your SAP support team for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant